• +86-576-84037988
  • +86-15888692147 / +86-13957611219
  • +86-576-84037588
  • info@tungtight.com / mould@tungtight.com
    1. English
    2. 中文
    3. Espanol

    dustbin mould

    new design trash can

    new design trash can
    new design trash can
    We are professional plastic dustbin mould manufacturer and supplier in China , we have been  successfully meeting the varied requirements of our clients by providing the best quality range of Plastic Dustbin Mould.

    Features:
    • Precisely designed
    • Optimum strength

    • High durability    
    • Fast cycle 
    • Delivery time on time 
    • competitve price 


    • High quality garbage bin moulds assembly key point. Every step machining need accurate, so the assembling of dustbin mould could be have no problems. The little detail for assemble garbage bin mould is cleaning work. Especially  for the mould water channel and screwing hole.
    • Runner system of 120L dustbin  mould.  If possible,choose the brand hot runner will be more better. Brand hot runner will be have after service all around the worlds. The heat system of international brand will be more quality. Choose the cold runner system should be considering the balance of runner gate, size of gate,injection pressure and so on.
    • Plastic industries garbage bin mould water channel: All the experienced mould buyers know how much important of cooling system for a mould. In case of constant cost, if the cooling system design well for high quality dust bin mould, cooling faster means,the mould could be save time for every shots to increase the efficient. Suitable cooling design should be consider about diameter, how to connector,the uniform of water channel.
    • School garbage bin mould maintain: the maintain work during the dustbin produce is important for keep long mould life. The fully maintain should be arrange for injection mould every time after finish produce. Especially the core and cavity part, main part should be make well rust protection. Dustbin mould need connector water when produce, so after production, the mould must be dry first  then put the protection oil.

    Mould material: P20, H13, 718H, 2738H, NAK80, S136,2316, SKD61 etc.

    Mould base:45#,P20H,LKM, HASCO ect as per customer’s requirement

    Cavity:Single/multi

    Runner:Hot/cold

    Design software:SOLIDWORKS,UG, PROE, CAD, CAXA ect.

    Plastic material:PP, PC, PS, PE, PU, PVC, ABS, PMMA ect.

    Mould life:300,000-5,000,000 shots

    Delivery time:25-75days

    Payment terms :By TT \LC

    Shipment:By sea, or airport. according to customer’s requirement.

    Submit Inquiry

    Please make sure your E-mail address is correct otherwise the recipient will not be able to reply.

    Send Message

    CONTACT US

    Copyright © 2020 TAIZHOU TUNGTIGHT MOULD&plastic CO., LTD Sitemap